Survey Statistics are not available For Export.


 



Survey Statistics items are the same values as seen in the Controller's Session Setup, Line Planning

Main ItemDescriptionValue TypeProperties

Total Lines

Number of all lines (points, single lines, routes), as selected in the on-line Controller's Session Setup Line Planning, regardless of its status.

int

Completed Lines

Number of lines (points, single lines, routes), as selected in the on-line Controller's Session Setup Line Planning, with status other than 'Planned'.
A 'Completed' line has always status 'Surveyed' or 'Replayed'.

int

Reference:

  • [None] (default)
    Actual number of completed lines
  • [Percentage of Total]
    100% * (Completed Lines / Total Lines)

Remaining Lines

Number of all lines (points, single lines, routes), as selected in the on-line Controller's Session Setup Line Planning, with status 'Planned'.
A 'Remaining' line has always status 'Planned'

int

Reference:

  • [None] (default)
    Actual number of remaining lines
  • [Percentage of Total]
    100% * (Remaining Lines / Total Lines)

Total Distance

Cumulative length of all Total Lines (see description above).
Notice that the length for each individual line can be seen in the Controller's Session Setup Line Planning dialog.
It depends on the current global range reference setting whether the distance is calculated on grid, or on the speroid (true).

double

Unit:

  • Survey Units
  • Meters
  • Millimeters
  • Centimeters
  • Kilometers
  • Feet
  • US Survey Feet
  • Natutical Miles

Completed Distance

Cumulative length of all Completed Lines (see description above).
It depends on the current global range reference setting whether the distance is calculated on grid, or on the speroid (true)

double

Reference:

  • [None] (default)
    Actual length, in survey units
  • [Percentage of Total]
    100% * (Completed Distance / Total Distance)

Remaining Distance

Cumulative length of all Remaining Lines (see description above).
It depends on the current global range reference setting whether the distance is calculated on grid, or on the speroid (true)

double

Reference:

  • [None] (default)
    Actual length, in survey units
  • [Percentage of Total]
    100% * (Remaining Distance / Total Distance)

Total Time

Total Distance / Speed
Total Distance (See description above)
Speed is user-selectable (under Controller's Session Setup, Planning, Settings)

  • Use Average Speed from Statistics
    This is the speed determined from all line history events with status Surveyed. The actual distance between start and stop position is calculated and divided by the actual time between start and stop. (The average speed value can be monitored by hoovering the mouse cursor above the Time Completed cell in the Statistics dialog)
  • Nominal Speed Value
    A fixed value, entered by the user.
time

Completed Time

Cumulative survey time of all Completed Lines (see description above).
Notice that the time for all on-line recording actions is included.

time

Remaining Time

Remaining Distance / Speed
Remaining Distance (See description above)
Speed is user-selectable (under Controller's Session Setup, Planning, Settings)

  • Use Average Speed from Statistics
    This is the speed determined from all line history events with status Surveyed. The actual distance between start and stop position is calculated and divided by the actual time between start and stop. (The average speed value can be monitored by hoovering the mouse cursor above the Time Completed cell in the Statistics dialog)
  • Nominal Speed Value A fixed value, entered by the user.
time

Next Planned Line

Name of the next survey line (point, single line or route).
This is the line with priority 2 in the on-line Session Setup Line Planning
(And becomes the current mainline when pressing <PgDn> in the Controller )

text
JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.